UKN Esperanza Phase-II

Esperanza Phase2 is located at Whitefield, spread over 7.5 acres. It comprises of 190 Apartments, 12 Row Houses and 10 Town Houses.

SCORES

Project score

8

Connectivity score

8.5

Location score

8

Investment score

8.2

Overview

Zone : Bangalore East
Landmark : Off Old Airport – Varthur Main Road
Location : Whitefield
Status : Ready to move in

No record found

Project Insight

Possession : Ready to move in

Total Land Area : 7.5 acres

Number of Units : 212units

Number of Phases : 2phase

Phase Details : Phase1 and Phase2

Tower Details : 3towers

Floor Details : 2floors

Project Approval : BBMP

Furnished?

Water Facility : 24/7

Total Free Space : 60percent

Legal

Khata Certificate and Khata Extract:

Bangalore Electricity Supply Company (BESCOM):

Bangalore Water Supply & Sewerage Board (BWSSB):

Outdoor Amenities

Swimming Pool

Toddler's Pool

Outdoor Play Field

Children's Play Area

Basketball Court

Tennis

Indoor Amenities

Club House : Event area| Indoor games| Squash court

Swimming Pool With Toddlers Pool

Conference Room

Gymnasium

Important Amenities

Rain Water Harvesting

Structure

Lift Make : OTIS/Schindler

Doors: : Wooden Frames and Flush Doors

Other Internal Door : Wooden Frames and Flush Doors

Flooring General

Main Lobbies : Granite/Kota/Natural Stone with Vitrified or Ceramic Tiles

Common Lobbies & Corridors : Granite/Kota/Natural Stone with Vitrified or Ceramic Tiles

Staircases - Main entry level : Granite/Kota/Natural Stone with Vitrified or Ceramic Tiles

Flooring

Individual Unit Foyer, Living & Dining : Vitrified/Vitro Ceramic Tiles

Kitchen : Vitrified/Vitro Ceramic Tiles

All Bedrooms : Vitrified/Vitro Ceramic Tiles

Balconies & Utility : Ceramic Terracotta Tiles in Balcony and

Toilets : Anti-skid Ceramic Tiles

False Ceiling

Toilets : Ceramic Tiles dado

Kitchen : Ceramic Tiles Dado of Two Feet above Granite

Kitchen

Granite counter and Sink : Polished Granite Platform with Stainless Steel Sink and Drain Board

Toilets

Wash basin -Master Bedroom : ISI Mark Ceramic Wash basin

Painting

Internal Walls & Ceilings : Oil-bound Distemper for all Plastered Walls and Ceilings

External finish : Cement Plaster & Paint

Electrical Outline Specification

2 BHK Flat : 3KW

3 BHK Flat : 3KW

100% DG back up for lifts, pumps & common area lighting : 2 & 3BHK - 1 KW 4 BHK – 2 KW

Concealed PVC conduits with Copper wiring : Concealed Conduits with Copper Wires

AC Points

Master Bedroom

living room

TV Points

Living

Master Bedroom

Telephone Points

Living

Master Bedroom

Other Electrical points

Exhaust Fan point : In Kitchen and Toilet

Water Purifier point : In Kitchen

Washing machine point : In Kitchen

Pricing

Similar Projects